Implementation

How Sarva approaches RCM automation implementation

Six phases, one principle: make system access, workflow ownership, staff review, and pilot measures explicit before any workflow goes live. Here is what happens in each phase, what your team does, what Sarva does, and what needs joint agreement.

The implementation process

Each phase produces a written output your team signs off before the next one starts.

1

Discovery and workflow selection

We identify the first workflow worth automating: the people who own it today, the inputs it consumes, where it stalls, and what a successful result would measure. Selecting one practical workflow comes before any talk of a platform-wide rollout.

  • Workflow walkthrough with the staff who run it today
  • Failure points and exception patterns worth measuring
  • Agreement on what a successful pilot would show
2

System compatibility and access review

We document the systems the workflow touches — practice management, EHR, clearinghouse, payer sources — and what access each connection requires. Compatibility is confirmed per system and per workflow; it is assessed during this phase, not assumed.

  • Connection method and required permissions per system
  • Data availability and quality in each source
  • Security and access requirements, documented with your team
3

Workflow mapping and exception ownership

The current process is mapped decision by decision: the normal path, the exceptions, the approval points, and who owns each one. Exception ownership is decided here so nothing in the workflow is unowned.

  • Normal cases and common exceptions, mapped explicitly
  • Required staff approvals and escalation paths named
  • Audit and reporting expectations recorded
4

Configuration and testing

The workflow is configured against representative test cases — real scenarios drawn from your own volume, not generic demos — and reviewed with your staff before anything runs on live work.

  • Test cases from your actual scenarios and payer mix
  • Staff walkthrough of flags, exceptions, and approvals
  • Adjustments made before the pilot starts
5

Staff review and pilot acceptance criteria

The pilot runs in a bounded scope with agreed acceptance criteria. Your reviewers work the exceptions from day one; the pilot is judged against the baseline agreed in discovery, not against a demo.

  • Baseline measures agreed before the pilot starts
  • Review checkpoints on an agreed cadence
  • Acceptance criteria defined in writing
6

Controlled rollout and ongoing review

What the pilot verified expands workflow by workflow. Rules, exceptions, and review points are revisited as payer behavior and your workflows change — the configuration is maintained, not frozen.

  • Workflow-by-workflow expansion
  • Periodic review of rules, exceptions, and outcomes
  • Support model confirmed during scoping

Who is responsible for what

Implementation works when both sides know their part. This matrix distinguishes customer responsibilities, Sarva responsibilities, and items requiring joint agreement — verified against how engagements actually run.

Implementation responsibility matrix
AreaYour teamSarvaAgreement
Workflow selection and prioritiesChoose the workflows and the order of rolloutAdvise on feasibility and sequencing based on the workflow reviewSingle owner
System access and permissionsGrant scoped access and approve connection methodsSpecify exactly what access is needed and whySingle owner
Workflow rules and exception pathsProvide the payer and client rules that govern the workConfigure the rules and exception handling in the platformJoint agreement
Exception review and approvalsStaff review exceptions and approve submissionsRoute exceptions with the context needed to decideSingle owner
Baseline and pilot measuresConfirm the measures reflect how success is judgedInstrument the workflow and report the resultsJoint agreement
Security and procurement reviewComplete internal security and procurement evaluationRespond to questionnaires and provide available evidenceJoint agreement

Common dependencies and limitations

Honest constraints that affect implementation scope, stated before you commit.

Access approvals take time inside organizations

Granting scoped access to practice-management or clearinghouse systems often runs through your own security review. This is usually the longest step, and it is on your side of the matrix.

Data quality shapes what automation can do

Incomplete eligibility responses, inconsistent remittance data, or sparse documentation limit what any automation can resolve without staff involvement. Limitations found in discovery are documented, not hidden.

Payer variation expands test cases

Each payer's rules and responses add test scenarios. Workflows spanning many payers need proportionally more configuration and testing.

Compatibility is assessed, not assumed

Support for a specific system depends on its connection method, product scope, required permissions, and the workflow in question. Connector names alone do not prove compatibility — see the connectors overview for how to assess each one.

Implementation questions

Sarva does not promise one universal timeline. Timing depends on the selected workflow, system access, permissions, data quality, test cases, review requirements, and your procurement process. These are confirmed during discovery, and the plan is built from them.

Start with a workflow, not a contract

Bring one workflow to a free assessment — leave with a scoped implementation picture and the questions that matter.